Diaphragm valve installation
Diaphragm valve installation and maintenance
1.. Before installation,
carefully check the operating conditions of the pipeline is consistent with the
scope of application of
the provisions of this valve, and should be cleaning the cavity to prevent
dirt jamming or damage the sealing parts.
2. The rubber lining laminated
rubber diaphragm surface Do not brushing the items of fats and oils, to prevent
rubber swelling,
and valve life.
3. Clues installation may not be binding on the hand wheel
or stem, lifting valve.
4. Manually operated valves, not by means of the
auxiliary bars bars to prevent torque damage drive components or sealed
parts.
5 The valve should be stored in dry and ventilated room, is strictly
prohibited to pile up, the stock valves at both ends of the
channel must be sealed, and open and close in a micro open.